Not every practice belongs to one stage. VSTA has two places for the others.
- A band runs alongside some of a layer's stages, from one stage to a later one. Use it for work that goes on while those stages happen, such as keeping up with a tax authority's changes while features are built.
- A row that runs through every stage sits at the foot of the value stream. Use it for practices that happen throughout, such as a team's stand-up. A value stream can have several of these rows, each with a group name such as "Team rhythm".
Add a band
- Turn on edit mode with Edit map, and open the details of the stage the band starts at.
- Under Add a band alongside, type the Band name and, if you like, a Description.
- In From this stage to, choose the stage the band ends at. Only later stages in the same layer are offered. A stage with no later stage says so.
- Choose Add band.
The band appears under its stages. Add practices to it from the slot in its top right corner at level 3 or closer.
A band's name, description and stages cannot be changed once it is made. To change them, move its practices out, remove the band, and add it again.
Remove a band
Open the band's details with Details and choose Remove band, or select the band in edit mode and press Delete. A band that still holds practices is not removed. Move its practices somewhere else first.
Put a practice in a row that runs through every stage
A row exists once a practice is in it. To start a new row:
- Add the practice to any stage, then open it.
- Under Where it sits, in Move, choose Runs through every stage in Place in.
- Type the row's name in Group (only for every stage), such as "Team rhythm". Leave it empty for a row with no name.
- Choose Move.
Once a row exists, add more practices to it from the slot in its top right corner at level 3 or closer. A row disappears when its last practice leaves it.